- Course Code
- END427
- Semester
- Seventh Term (Fall)
- Theory+Practice
- 3 + 1
- ECTS
- 5
| Course Type | Compulsory Course |
| Course Level | Bachelor's Degree |
| Year of Study | 4 |
| Semester | Seventh Term (Fall) |
| ECTS | 5 |
| Name of Lecturer(s) |
|
| Learning Outcomes |
At the end of this course, the students;
- Have the ability to define quality.
- Have the ability to analyze quality costs.
- Gains the ability to calculate poor quality losses with the Taguchi loss function.
- Have the ability to use problem solving tools.
- Have the ability to make measurement system analysis.
- Have the ability to make process capability analysis.
- Have the ability to interpret control charts.
- Have information about ISO9000 Quality Standards and total quality management.
- Have the ability to analyze error types and effects.
- Have the ability to create a quality house.
- Have the ability to perform quality control based on acceptance sampling.
- Have the ability to calculate reliability and system reliability.
- Have the ability to work in disciplinary and multi-disciplinary teams and to receive and give clear and understandable instructions.
|
| Mode of Delivery | Face to face |
| Prerequisites | No |
| Recommended Optional Programme Components | None |
| Course Description | This course introduces quality and quality variation, total quality, quality assurrance (ISO 9000 etc.), data analysis and problem solving, tolerances and spesifications, statistical process control, acceptence planning, quality costs, FMEA (Failure Mode and Effect Analysis), QFD (Quality Function Deployment), benchmarking and strategic management topics. |
| Course Contents |
| WEEK |
TOPICS |
|
1st Week |
Introduction: Quality concept, Dimensions of quality, Concept of quality improvement, quality assurance based on ISO 9001:2015. |
|
2nd Week |
Quality costs. |
|
3rd Week |
Taguchi quality loss functions. |
|
4th Week |
Problem solving techniques for control and improvement |
|
5th Week |
Control charts for variables. |
|
6th Week |
Control charts for attributes. |
|
7th Week |
Applications of MINITAB for quality control I. |
|
8th Week |
Midterm. |
|
9th Week |
Process capability analysis. |
|
10th Week |
Failure Mode Effect Analysis (FMEA), Quality Function Deployment (QFD). |
|
11th Week |
Acceptance sampling and operating characteristic (OC) curve. |
|
12th Week |
Reliability and system reliability. |
|
13th Week |
Applications of MINITAB for quality control II. |
|
14th Week |
General review |
|
| Recommended or Required Reading | Montgomery, D. (2005) Intro to Statistical Quality Control, John Wiley & Sons;
Kolarik, W. (1995) Creating Quality, McGraw-Hill. |
| Planned Learning Activities and Teaching Methods |
- Lecture
- Questions/Answers
- Problem Solving
- Discussion
- Other
- Practice
|
| Assessment Methods and Criteria |
|
Quantity |
Percentage (%) |
| Mid-term |
1 |
30 |
| Assignment |
1 |
5 |
| Quiz |
3 |
10 |
| Project |
1 |
15 |
| Total(%) |
|
60 |
| Contribution of In-term Studies to Overall Grade(%) |
|
60 |
| Contribution of Final Examination to Overall Grade(%) |
|
40 |
| Total(%) |
|
100 |
|
| ECTS Allocated Based on Student Workload |
| Activities |
Quantity |
Duration (Hour) |
Total Workload (Hour) |
| Midterm exam |
1 |
2 |
2 |
| Preparation for Quiz |
3 |
2 |
6 |
| Individual or group work |
14 |
2 |
28 |
| Preparation for Final exam |
1 |
20 |
20 |
| Course hours |
14 |
4 |
56 |
| Preparation for Midterm exam |
1 |
20 |
20 |
| Laboratory (including preparation) |
|
|
|
| Final exam |
1 |
2 |
2 |
| Homework |
2 |
8 |
16 |
| Project |
1 |
20 |
20 |
| Total Work Load | 170 |
| Total Work Load / 30 (h) | 5.66 |
| ECTS Credit of the Course | 5 |
|
| Language of Instruction | Turkish |
| Work Placement(s) | No |
Programme Qualifications / Learning Outcomes
|
LO1 |
LO2 |
LO3 |
LO4 |
LO5 |
LO6 |
LO7 |
LO8 |
LO9 |
LO10 |
LO11 |
LO12 |
LO13 |
| K1 |
X |
|
|
X |
|
|
|
|
|
|
|
X |
|
| K2 |
X |
X |
|
X |
|
|
X |
|
|
|
|
X |
|
| K3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| K4 |
|
X |
|
X |
|
|
X |
|
X |
|
|
|
|
| K5 |
X |
|
X |
|
X |
X |
|
|
|
X |
X |
|
|
| K6 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
| K7 |
X |
|
|
|
|
|
|
|
|
|
|
|
X |
| K8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| K9 |
|
|
|
|
|
X |
X |
X |
|
|
|
|
X |
| K10 |
|
|
|
|
|
|
|
|
X |
|
X |
|
|
| K11 |
|
|
|
|
|
|
|
|
|
|
|
|
|