| Course Type | Elective Course |
| Course Level | Master's Degree With Thesis |
| Year of Study | - |
| Semester | - |
| ECTS | 10 |
| Name of Lecturer(s) |
|
| Learning Outcomes |
At the end of this course, the students;
- Gain an ability to apply knowledge of mathematics, science, and engineering
- Gain an ability to identify, formulate, and solve engineering problems
- Gain an ability to use the techniques, skills, and modern engineering tools necessary engineering practice.
- Explain the strategic, tactical and operational level decisions
- Define the production types
- Design the facilities, processes and capacities
- Explain the important issues in production development
- Define the inventory models, scheduling problems and their solution methods and plan the production
|
| Mode of Delivery | Face to face |
| Prerequisites | No |
| Recommended Optional Programme Components | None |
| Course Description | Planning and scheduling problems in production systems. Master production schedule. Production programs. Order (production) quantities. Material and capacity requirement planning. Line balancing problems. Mathematical models and heuristic methods for single and multiple machine scheduling problems. |
| Course Contents |
| WEEK |
TOPICS |
|
1st Week |
Production, Production Systems, Production Planning and Control |
|
2nd Week |
Design of a Forecasting System |
|
3rd Week |
Design of Products and Process, Process Planning |
|
4th Week |
Capacity Planning-Technology and Equipment Selection |
|
5th Week |
Plant Layout and Location, Work Design and Measurement |
|
6th Week |
Master Production Planning, Aggregate Planning |
|
7th Week |
Short Term Scheduling |
|
8th Week |
Midterm Exam |
|
9th Week |
Periodic and Continuous Review Inventory Models, |
|
10th Week |
Static and Dynamic Inventory Models, Inventory Control |
|
11th Week |
Materail Requirements Planning (MRP) |
|
12th Week |
Lot Sizing Techniques in MRP |
|
13th Week |
MRP Applications |
|
14th Week |
MRP and CRP (Capacity Requirement Planning) |
|
| Recommended or Required Reading | Johnson, L.A, Montgomery, D.C, (1974) Operations Research in Production Planning, Scheduling, and Inventory Control, John Wiley & Sons.
Narasimhan, S.L, McLeavey, D.W, Billington, P.J, (1995) Production Planning and Inventory Control, Prentice Hall.
|
| Planned Learning Activities and Teaching Methods |
- Lecture
- Questions/Answers
- Problem Solving
- Practice
- Presentation
|
| Assessment Methods and Criteria |
|
Quantity |
Percentage (%) |
| Mid-term |
1 |
30 |
| Project |
1 |
30 |
| Total(%) |
|
60 |
| Contribution of In-term Studies to Overall Grade(%) |
|
60 |
| Contribution of Final Examination to Overall Grade(%) |
|
40 |
| Total(%) |
|
100 |
|
| ECTS Allocated Based on Student Workload |
| Activities |
Quantity |
Duration (Hour) |
Total Workload (Hour) |
| Midterm exam |
1 |
2 |
2 |
| Preparation for Quiz |
|
|
|
| Individual or group work |
14 |
14 |
196 |
| Preparation for Final exam |
1 |
25 |
25 |
| Course hours |
14 |
3 |
42 |
| Preparation for Midterm exam |
1 |
25 |
25 |
| Laboratory (including preparation) |
|
|
|
| Final exam |
1 |
2 |
2 |
| Homework |
1 |
14 |
14 |
| Total Work Load | 306 |
| Total Work Load / 30 (h) | 10.2 |
| ECTS Credit of the Course | 10 |
|
| Language of Instruction | Turkish |
| Work Placement(s) | No |